The weight itself should be certified prior to testing. The test load used must be at least 100% and no more than 125% of the equipment’s rated capacity unless otherwise recommended by the original equipment manufacturer (OEM). Existing crane and hoist systems should likewise be load tested at a minimum of once every four years. Because load tests confirm the ability of the crane and hoist to safely operate as intended, they must be completed whenever this overhead lifting equipment is newly installed, altered, repaired, or modified before being placed into service. ![]() A load test is performed to verify that a specific crane or hoist will safely perform all of its functions while supporting a test load whose weight is at least equal to the equipment’s rated capacity.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |